Benjamin Homes Logo
MENU
  • HOME
  • ABOUT
  • OUR PROCESS
  • THE OZARK
  • CONTACT

The Ozark, Bokeelia Florida

Stay Tuned

Check in from time to time we will be uploading pictures of the build process with this one of a kind residence and highlighting the many concealed conditions you typically don't get to see.


Roof Truss Installation

Block Wall Construction

Slab Prep & Cast in Place pouring

Underground Plumbing

Foundations and Footings

Fill Dirt

Fill Dirt

Building on a firm foundation requires the existing grade to be raised due to several possible factors, building in a flood prone area, septic system elevation requirements, last of all which is standard at minimum is the elevation of the lowest slab being 18" above the crown of road. 

Raising the elevation of the lowest slab ensures positive drainage away from the home which is always a plus.

Lot Clearing

Lot Clearing, Prepping for Fill Delivery

A firm foundation always comes down to prepping the soil conditions and absolutely verifying that the building area is completely clean of organic material.

Removing all tree and shrub roots and existing grade to the predetermined depth ensures that the final root rake is free of all organic and deleterious material.

ADDRESS

6220 Castlewood Cir FM, FL 33905 License # - CRC1332317  

CONTACT

Office: 239-288-7254 Email: hgbenjaminhomes@gmail.com  

LINKS

ABOUT BENJAMIN HOMES OUR PROCESS THE OZARK CONTACT  
All plan designs © Copyright 1998-2025 Benjamin Homes, LLC
Website design by Daisy Pieraldi
Made To Live - The Benjamin Homes Way
Crafted by PhotoBiz
Benjamin Homes Logo
CLOSE
  • HOME
  • ABOUT
  • OUR PROCESS
  • THE OZARK
  • CONTACT